Project listing
logo

SEA - Engineering Architecture

Design, Management, Monitoring

Project listing
Ordered by :
Activity :
Typology :
! Double-arrow shows up while hovering the title with the mouse -> Content of the entries can be developed.
Project Managment & Methods 
Application for material fatigue assessment of bridges subjected to rail traffic loads  Calculation of material fatigue by cumulative damage in accordance with Eurocode
Typology : Methods : Engineering
Status : Completed
City : , Switzerland
Client : SBB CFF FFS, Public
Project pilot :

SEA - Engineering Architecture

Responsible: Roman Schirmer, Architect, Civil Engineer

sea.archi

10.2023 - 02.2024
Major restructuring program of a pharmaceutical distribution centre  Distribution centre for pharmaceutical products - Works without interruption of ongoing operation - Project lead of the general planner
Typology : Industrial: Pharmaceutical distribution
Status : Completed
City : Ecublens, VD, Switzerland
Area : 9'798 m², Restructuration, IPMS2 (interiors)
Budget : CHF 16'000'000, Excl. VAT, Restructuration
Client : Galexis AG, Private entity
Mission :
  • Ph. 3 PROJECT PLANNING
  • Ph. 4 TENDER
  • Ph. 5 REALISATION
Project pilot :

CSD Ingénieurs SA

Responsible: Roman Schirmer, Architect, Civil Engineer

Architecture, General planning

  • Management and coordination
  • Resource management and monitoring
  • Coordination of the specialised professionals, transdisciplinary monitoring of the objectives defined with the client. Management of contracts and monitoring of the services provided by the specialised professionals.
  • Cost management
  • Establishment and management of the general timetable. Monitoring of deadlines.
  • Contracts for work
  • General management of the work
  • Cost control and expenditure monitoring
  • Construction scheduling

Partners :

Perrin Spaeth - Bureau d’ingénieurs conseils SA

Responsible: Joseph La Luna, Engineer

www.perrin-spaeth.ch Electrical engineering

Execution of the works :

ADV Constructions SA

Civil engineering works, Masonry

Morand SA

Steel structure, Facade building

Ciel électricité SA

Electrics

Tecton Etanchéité SA

Waterproofing, Roofing

03.2019 - 01.2021
ZAC Porte de Paris - Transport hub 
Création d'un pôle urbain multimodal : métro, stationnement souterrain, tramway, aménagements des espaces publics et voies de circulation

Le plan d’aménagement élaboré par Antoine Grumbach, architecte-urbaniste, pour cette Zone d’Aménagement Concertée (ZAC) de 17,5 hectares visait à :
- Réorganiser complètement la structure viaire.
- Réaménager les espaces publics, comprenant la création d’une place entourée de constructions nouvelles et anciennes, avec une valorisation des espaces piétons et de la mobilité douce.
- Aménager le tramway T8, dont le terminus est situé au centre de la ZAC.
- Transformer la station de métro de la ligne 13.
- Reconfigurer complètement un parc de stationnement souterrain interrégional (PIR).

Le projet, placé sous la tutelle de la communauté d’agglomération Plaine Commune, impliquait l’intervention de quatre équipes de maîtrise d’œuvre différentes, travaillant de manière indépendante sur des ouvrages superposés et juxtaposés :
- BERIM était en charge des aménagements de surface.
- BETEM s’occupait de la restructuration du PIR.
- Le pôle ingénierie de la RATP gérait la restructuration de la station de métro.
- SYSTRA supervisait l’aménagement du tramway.

Le PIR était situé sous la future station de tramway, la station de métro était accolée au PIR, et le tracé du tramway passait au-dessus du PIR et de la station de métro. Les aménagements des espaces publics et des voies de circulation recouvraient ces ouvrages souterrains. (fr)
Typology : Urban Infrastructure
Status : Completed
City : Saint-Denis, IDF, France
Area : 17ha
Client : SEM Plaine Commune Development, Public
Client : Ingérop Management SAS, Private entity
Mission :
  • Planning coordination
Project pilot :

Ingérop Management SAS

Responsible: Jean-Christophe Vigné & Marc Bourgeois

www.ingerop.fr Project management

  • Management and coordination
  • Coordination of studies
  • Technical synthesis

Consultants :

Roman Schirmer Architecte

Project management

  • Coordination of studies
  • Technical synthesis

04.2011 - 08.2013
VINCI - Chantiers Modernes  Programming of an Rhinoceros Layermanager with Excel-Interface
This tool was required for the planning coordination in the context of the restructuring of the "Halles" in the 1st arrondissement of Paris. It allows the automatic normalisation of the 3D models received from the different participants before their integration into the coordination model.
More specifically, this application allows the management of layers in Rhinoceros files via MS Excel and the automatic modification of these layers according to a standard developed for the project. The application was programmed in Visual Basic for Applications (VBA).
Typology : Methods : Management
Status : Completed
City : Paris, France
Client : SEMAVIP, Public
Client : Les Chantiers Modernes BTP, VINCI-Construction, Private entity
Mission :
  • Planning coordination
Project pilot :

Roman Schirmer Architecte

11.2011 - 01.2012
ZAC des Batignolles - Construction of an urban slab of 550 x 70m  Reconstruction of railway infrastructure on the outskirts and under a 35,000 m² urban slab
Le projet d’aménagement de la Zone d’Aménagement Concerté (ZAC) incluait la reconfiguration complète des réseaux urbains et des installations techniques ferroviaires existantes sur le site, ainsi que le déplacement des voies ferrées, principalement sous une nouvelle dalle urbaine de 35'000 m². Ce projet impliquait deux maîtres d'ouvrage : la SNCF et Paris Batignolles Aménagement (BPA), majoritairement détenue par la ville de Paris.

La dalle urbaine mesure 550 mètres de longueur et 70 mètres de largeur, reposant sur quatre files porteuses. Elle est constituée de poutres continues en béton précontraint, réparties sur trois travées, avec une hauteur de section brute d'environ 3 mètres. Ces poutres transfèrent les charges aux supports, couvrant des portées allant jusqu’à 30 mètres. La fondation de la dalle comprend environ 600 pieux (diamètre de 0,80 à 1,20 mètre) et barrettes (1,20 x 2,80 mètres), ancrés jusqu'à 25 mètres de profondeur pour traverser les couches marno-calcaires érodées et atteindre les sables denses sous-jacents.

La dalle supporte 20'335 m² d'îlots composés d’immeubles d’une dizaine d’étages et 14'400 m² d’espaces publics.

En tant que prestataires pour la SNCF, nous étions chargés de la coordination entre les nouvelles installations ferroviaires (voies, base de travaux, réseaux et bâtiments) et, d'autre part, les réseaux urbains, les installations de viabilisation et les constructions adjacentes ou recouvrant les voies. Cela incluait notamment la superstructure de la dalle et ses fondations, un pont routier et une passerelle surplombant les voies ferrées découvertes.
(fr)
Typology : Urban Infrastructure
Status : Completed
City : Paris, France
Area : 5.5 ha
Client : SNCF - Ville de Paris, Public
Client : Ingérop-Management SAS, Private entity
Mission :
  • Planning coordination
Project pilot :

Ingérop Management SAS

Responsible: Olivier Mollard, Civil Engineer

www.ingerop.fr Project management

  • Management and coordination

Consultants :

Roman Schirmer Architecte

Project management

  • Coordination of studies
  • Technical synthesis
  • Technical coordination

08.2009 - 01.2012
Charta für grafische Arbeiten  Setting up a methodological tool
By creating a work methodology in AutoCAD, we aimed to improve the quality of file exchanges between the company's employees and its partners. To enable everyone to quickly understand the content of a drawing file and to be able to modify it while remaining within the same work logic.
In addition to the fluidity of exchanges, the charter aimed to guarantee the quality of drawings for display and printing and the quality of project presentations through the uniformity of the drawings produced by the various participants.
This mission was concluded by a methodological note, by the implementation of templates and standard documents as well as by training sessions given to the company's employees.
Typology : Methods : Management
Status : Completed
City : Paris, France
Client : CLC Gestion de projet et conseil / Ingérop-Management SAS, Private entity
Project pilot :

Roman Schirmer Architecte

01.2009 - 04.2009
Architecture & Engineering 
Consolidation d'un immeuble historique  Construction traditionelle en maçonnerie au mortier terre-chaux
Typology : Housing : Apartment buildings
Status : Ongoing
City : Valensole, Alpes-de-Haute-Provence, France
Client : , Private person
Project pilot :

SEA - Engineering Architecture

Responsible: Roman Schirmer, Architect, Civil Engineer

sea.archi

07.2022 - Ongoing
Distillerie de Saconnex-d'Arve 
Le bâtiment de la distillerie, destiné à un usage industriel et commercial, héberge actuellement trois exploitants : un brasseur, une cave à vin et une distillerie. Il comprend une boutique ouverte au public ainsi qu'un espace de bureaux partagé, qui abrite également les vestiaires et les sanitaires.

L'ensemble du bâtiment a été reconstruit tout en préservant les éléments du gros-œuvre en béton armé et une charpente métallique. Les parties restantes du bâtiment, partiellement contaminées par des polluants, ont été démolies après élimination de l'amiante, des PCB et du plomb.
Le volume reconstruit est principalement composé de bois, avec des éléments hybrides bois-béton. Dans une optique d'économie et de durabilité, l'utilisation de matériaux biosourcés a été privilégiée, notamment la laine de bois pour l'isolation. Les matériaux sont largement laissés bruts, limitant ainsi le recours à des produits de finition.

Commandé par la commune de Plan-les-Ouates, le projet est réalisé en entreprise totale. En qualité de sous-traitant, SEA a été investi de la responsabilité du développement technique à partir d'un avant-projet. Notre mandat impliquait la finalisation du projet en vue du lancement des appels d'offres (phase 41), puis son affinement ultérieur en prévision de la phase d'exécution (phase 51), aboutissant avec l'établissement des plans de recollement (phase 53) une fois les travaux achevés.
Cette mise au point technique s'est déroulée en étroite collaboration avec divers mandataires spécialisés, incluant l'ingénieur civil, le physicien du bâtiment, l'ingénieur CVSE et l'expert AEAI.
Les procédures d'appel d'offres ont été conduites en stricte conformité avec les principes fondamentaux du droit des marchés publics, en accord avec les exigences du cahier des charges.

Par ailleurs, le projet a été élaboré en employant la méthode BIM, ce qui a permis de renforcer notre expertise dans son application, particulièrement durant la phase de réalisation.

(fr)
Typology : Industrial and commercial buildings
Status : Completed
City : Saconnex-d'Arve (GE), Switzerland
Area : 954 m², Construction, IPMS 3C (interiors)
Budget : CHF 3'250'000, Excl. VAT, Restructuration
Client : Commune de Plan-les-Ouates, Public
Client : Batineg SA, Private entity
Mission :
  • Ph. 3 PROJECT PLANNING
  • Ph. 4 TENDER
  • Ph. 5 REALISATION
Partners :

SEA - Engineering Architecture

Responsible: Roman Schirmer, Architect, Civil Engineer

sea.archi Architecture

  • Project design
  • Technical development
  • BIM modelling
  • Tender plans
  • Description, presentation and coordination of the execution project
  • Technical development and elaboration of implementation details
  • Implementation plans

INGEA SA

Responsible: Rui Pedro Sales Sério Lourenço, Civil Engineer

ingea.ch/ Civil engineering

Despres Études Énergétiques

Responsible: Alain Després, Engineer

despres.ch Indoor climate

12.2021 - 02.2024
Floors made of wood - earth - concrete  Variant study and optimisation
Typology : Public : Schools
Status : Study
City : Lausanne, Switzerland
Client : , Private entity
Project pilot :

Roman Schirmer, Architect, Civil Engineer

Sten Rettby, Civil Engineer

08.2023 - 09.2023
Roofing with a tensioned membrane 
Typology : Housing : Terrace
Status : Completed
City : , Brazil
Client : , Private person
Project pilot :

Roman Schirmer, Architect, Civil Engineer

Riscala Neme

07.2023 - 08.2023
Sihlsteg Spinnerei - A bridge for light traffic  Engineering competition: steel and timber truss bridge
Typology : Civil engineering : bridges
Status : Study
City : Langenau am Albis, ZH, Switzerland
Client : Kanton Zürich, Public
Mission :
  • Competition
Participation : Partnership with Equibridges AG. Concept proposal and development, landscape integration, formal design
Partners :

SEA - Engineering Architecture

Responsible: Roman Schirmer, Architect, Civil Engineer

sea.archi Architecture, Civil engineering

  • Project design
  • Analysis of the urban, landscape and natural context. Formulation of the project's integration principles.
  • Technical development
  • Structural concept
  • Structural design

Equi Bridges AG

Responsible: Poul Schroeder, Civil Engineer

equibridges.ch Civil engineering

  • General timetable
  • Construction scheduling
  • Structural concept
  • Structural design

03.2021 - 04.2021
Chur West station-bridge  Engineering competition : New railway station Chur West, crossing Raschärenstrasse
Le projet aspire à créer une place fonctionnelle, gérable, mettant en valeur la géométrie simple et efficace de la structure porteuse du pont. L'espace extérieur sous le pont est marqué par les murs de tête des culées inclinées vers l'intérieur et est divisé en trois zones par les piliers : à l'est, la Raschärenstrasse avec l'arrêt de bus et la montée d'escalier ; à l'ouest, la station de vélos et une rampe d'accès au quai ; entre les deux, un grand escalier en acier menant aux quais par quatre rampes. Tous les locaux annexes, comme les toilettes et les installations techniques, sont situés dans les culées.

La structure du pont est conçue en béton précontraint, laissé apparent. L'élancement est accentué par un calepinage horizontal des éléments du tablier. L'escalier central, la station de vélos et les garde-corps sont en acier, tout comme les abris de quai filigranes, inspirés du système traditionnel des RhB.

La plus grande distance entre les culées est de 62,8 m, avec des portées comprises entre 17,3 m et 25,2 m. La largeur totale de la superstructure, incluant les deux voies, le quai central et la piste cyclable en béton armé intégrée, est de 22,05 m. La structure pour la piste cyclable supplémentaire au niveau des voies est fixée en porte-à-faux sur la section en auge du côté nord.

La sous-structure est composée de quatre piliers en béton armé de 2,00 m x 0,80 m chacun et de deux culées dont les murs de front sont inclinés vers l'intérieur. Le mur de front côté est est incliné par rapport à la direction longitudinale du pont, tandis que celui du côté ouest est perpendiculaire à cette direction. Tant les piliers que les culées sont fondés superficiellement. (fr)
Typology : Civil engineering : bridges
Status : Study
City : Chur, GR, Switzerland
Client : Rhätische Bahn, Public
Mission :
  • Competition
Participation : In partnership with Equibridges AG. Contribution to the formal development of the project.
Project pilot :

Equi Bridges AG

Responsible: Poul Schroeder, Civil Engineer

equibridges.ch Civil engineering

  • Proposal for organisation and division of tasks.
  • Estimation of administrative, study and construction costs.
  • Preliminary timetable for studies and implementation, highlighting the impact of changes.
  • Clarification of the technical, legal, economic and environmental framework. Concept proposal and feasibility check.
  • Structural concept
  • Structural design

Partners :

Flender Generalplaner

, Architect

www.kaiflender.de Architecture

  • Setting up the project duty booklet
  • Project design

SEA - Engineering Architecture

Responsible: Roman Schirmer, Architect, Civil Engineer

sea.archi Architecture, Civil engineering

  • Digital modelling
  • Structural design

Damien Lamoly

, Technician

  • Technical drawing
  • Structural design

02.2021 - 02.2021
Chicago O'Hare International Airport  New Terminal 2
Typology : Public : Airports
Status : Study
Client : Chicago Department of Aviation, Public
Mission :
  • Restricted competitions
Project pilot :

Santiago Calatrava GmbH

Responsible: Santiago Calatrava, Architect, Civil Engineer

calatrava.com Architecture

Roman Schirmer

12.2018 - 03.2019
Renovation, extension and modernisation of an historical builing  Zürich villa of the early 19th century used as an office building - Site in use during the works
Typology : Listed buildings : Conversion
Status : Completed
City : Zürich, Switzerland
Area : 1100 m²
Budget : CHF 3'400'000, Excl. VAT, Restructuration
Client : , Private entity
Mission :
  • Ph. 3 PROJECT PLANNING
  • Ph. 4 TENDER
  • Ph. 5 REALISATION
Project pilot :

Santiago Calatrava GmbH

Responsible: Gerrit Teufel

calatrava.com

  • Management and coordination
  • Clarification of the technical, legal, economic and environmental framework. Concept proposal and feasibility check.
  • Sketch/conceptual design: analysis of intentions, needs and programme in the development of an architectural concept translated into a sketch.
  • Construction project: Elaboration of the construction project in view of the building application. Definition of construction principles and materials.

Roman Schirmer

  • Technical development
  • Elaboration of construction and architectural details after defining the quality standard with the client.
  • Building specifications
  • Contracts for work
  • Coordinated construction schedule
  • Description, presentation and coordination of the execution project
  • Technical development and elaboration of implementation details
  • Cost control and expenditure monitoring
  • Site works supervision (architectural)
  • Site works supervision (technical)
  • Construction cost monitoring

Execution of the works :

KESSLER Bauunternehmung AG

Responsible: Reto Kessler

kesslerbau.ch Civil engineering works

DE CAPITANI Baugeschäft AG

Responsible: Roger Schmid

www.decapitanibau.ch Masonry

Max Keller AG

Responsible: Jorge Perez

mk-klima.ch Air conditioning, MCR, Ventilation

03.2018 - 03.2019
Reconstruction of the Morandi Bridge in Genoa  Cable-stayed bridge
Typology : Civil engineering : bridges
Status : Study
City : Genoa, It
Budget : 227'000'000 €, Excl. VAT, Construction
Client : Reconstruction commissioner of the collapsed Morandi bridge, Public
Mission :
  • Competition
Project pilot :

Santiago Calatrava GmbH

Responsible: Santiago Calatrava, Architect, Civil Engineer

calatrava.com

  • Project design

10.2018 - 12.2018
Contournement routier de Grüningen (Concours – Projet lauréat) (fr) 
Mandat d’études parallèles : Projet urbain, paysager, routier & conception d’un ensemble d’ouvrages d’art : deux ponts routiers en acier d’environ 90 m de longueur, une tranchée couverte d’environ 250 m de longueur.

Démarche de projet
Après une analyse approfondie du contexte, ce projet visait à proposer un nouveau tracé routier ainsi qu'à concevoir les ouvrages de génie civil nécessaires. Les analyses préliminaires se sont concentrées sur trois grands axes : le paysage et le contexte géologique, l'activité et les flux, ainsi que l'histoire du site.
Initialement, un relevé a été réalisé pour établir un modèle topographique, en considérant le contexte géologique global et en effectuant des reconnaissances sur place. Ensuite, l'identification de points remarquables, de zones à protéger et de perspectives à valoriser a été entreprise pour définir les paramètres clés du tracé.

L'analyse des flux, incluant la circulation piétonne et automobile, en relation avec l'utilisation des espaces publics et des activités dans les bâtiments environnants, a permis de prendre des décisions stratégiques. Cette approche a non seulement défini les zones à circulation modérée, mais a également influencé la configuration et la position des raccordements de la voie de contournement, en favorisant des tracés continus pour la circulation douce et en minimisant l'impact sonore.

Une fois le tracé principal défini, plusieurs variantes ont été étudiées et confrontées aux normes et régulations en vigueur pour vérifier leur faisabilité. L'évaluation de la performance routière, de l'impact sur l'activité locale et de l'intégration paysagère a permis d'affiner progressivement la proposition.
Les tracés des voies ont été établis en plan et en profil, puis visualisés en trois dimensions à l'aide d'une maquette numérique du site. Cette représentation 3D a été générée par une application crée pour le projet qui fournissait également les tracés en plan et en profil annotés, permettant une analyse rapide de variantes.

Ensuite, l'étude des ponts, incluant un pont routier et un pont pour la circulation douce, ainsi que la définition du procédé de construction du tunnel en tranchée couverte, des portaux du tunnel et le prédimensionnement des structures de chaussée ont suivi la finalisation du tracé. (fr)
Typology : Civil engineering : bridges
Status : Study
City : Grüningen, Zürich, Switzerland
Budget : CHF 24'000'000
Client : Kanton Zürich, Public
Mission :
  • Restricted competitions
Project pilot :

Santiago Calatrava GmbH

Responsible: Manuel Zoller, Roman Schirmer, Brian Fennessy, Philip Scheidegger

calatrava.com Architecture, Civil engineering

10.2017 - 09.2018
UAE Pavillion EXPO 2020 Dubai 
Typology : Public : Exposition spaces
Status : Completed
City : Dubai
Client : , Public
Mission :
  • Ph. 3 PROJECT PLANNING
  • Ph. 4 TENDER
Project pilot :

Santiago Calatrava GmbH

Responsible: Santiago Calatrava, Architect, Civil Engineer

calatrava.com

03.2017 - 12.2017
Grand Paris Express – Gares de Créteil l’Échat et de Saint-Maur Créteil (fr) 
Typology : Public : Train Stations
Status : Completed
City : Ile-de-France, France
Area : Créteil : 8700 m², Construction, IPMS1 (interiors)
Area : St-Maur : 9000 m², Construction, IPMS1 (interiors)
Client : Société du Grand Paris, Public
Mission :
  • Ph. 3 PROJECT PLANNING
  • Ph. 4 TENDER
Project pilot :

Systra

www.systra.com

Partners :

ANMA - Architectes et Urbanistes

Responsible: Jean-François Vaudeville, Architect

anma.fr Architecture

  • Management and coordination

Nicolas Beyret, Architect

  • Project design

Roman Schirmer, Architect, Civil Engineer

  • Technical development and elaboration of implementation details

09.2016 - 03.2017
Abondant 3 - Construction of a low-energy house  The garden and its house, a spatial continuum.
Three principles have significantly determined the development of the project.

1. energy efficiency: geothermal energy, use of natural solar radiation and efficient thermal insulation.
2. perceptible and functional continuity of the living space beyond the building envelope.
3. integration into the context through the analysis and reinterpretation of local typologies.

The chosen cross-section profile, a roof that sits directly on the ground, is inspired by traditional agricultural buildings of the region, whose flat tiled roofs become the façade.
This cross-section profile is relatively compact. It offers a low envelope-to-volume ratio, favouring the thermal insulation of the building.

The orientation of the building favours the relationship to the south.
The north façade on the site boundary consists of a large tile roof pitched at 45°. Heavily insulated, it protects the building and the garden from the prevailing rain winds and cold.
The south façade opens onto the landscape garden. It has a 60° slope to make the most of passive solar radiation. The façade is equipped with devices that allow the incoming radiation to be regulated in winter and blocked in summer.

The spatial continuity between inside and outside is emphasised by the arrangement of small volumes (sanitary facilities, outdoor workshop, outdoor bicycle shelter), fixed furniture (kitchen sideboard and cupboard for the heating system), by the continuity of the floor, the continuity of the wooden structure, echoes to indoor elements outside, such as the lighting fixtures.
Even in winter, when the windows are closed, the perception of the living space is extended. It extends to the boundaries of the garden.
Typology : Housing : Houses
Status : Completed
City : Dreux, Eure et Loire, France
Area : 171 m², IPMS1 (interiors)
Budget : 380.000 €, Excl. VAT, Construction
Client : , Private entity
Mission :
  • Ph. 1 STRATEGIC PLANNING
  • Ph. 2 PRELIMINARY STUDIES
  • Ph. 3 PROJECT PLANNING
  • Ph. 4 TENDER
  • Ph. 5 REALISATION
Project pilot :

Roman Schirmer Architecte

Architecture

  • Management and coordination
  • Setting up the project duty booklet
  • Coordination of studies
  • Management
  • Cost management
  • Establishment and management of the general timetable. Monitoring of deadlines.
  • Project design
  • Technical development
  • Graphical representation
  • Site works supervision

Partners :

Jean-Baptiste Fourmont Architecte

  • Cost management
  • Project design
  • Site works supervision

Execution of the works :

Mega Charpente Sarl

Responsible: Michael Menez

www.megacharpente.fr Carpentry

10.2011 - 10.2016
Heavy restructuring of a 19th century building  Office building - Paris 9ème
Typology : Offices : Building restructuring
Status : Completed
City : Paris, France
Area : 1450 m², Restructuration, IPMS1 (interiors)
Budget : 1'650'000 €, Excl. VAT, Restructuration
Client : AEW Europe, Private entity
Mission :
  • Ph. 51 Execution planning
  • Ph. 52 Execution, works supervision
Project pilot :

Atelier Raf Listowski

Responsible: Roman Schirmer, Architect

www.raflistowski.com Architecture

  • Technical development and elaboration of implementation details
  • Implementation plans
  • Construction scheduling
  • Site works supervision

03.2016 - 09.2016
Urban renewal project 'Porto Maravilha' : 'Prainha' Sector  Feasibility study
Typology : Urban Renewal
Status : Study
City : Rio de Janeiro - RJ, Brazil
Area : 9.3 ha, Renovation
Client : Consórcio Porto Novo, Private entity
Client : GDP - Gerenciamento e Desenvolvimento de Projetos , Private entity
Mission :
  • Ph. 21 Definition of the project, feasibility study
Project pilot :

GDP - Gerenciamento e Desenvolvimento de Projetos

Responsible: Sergio Leusin, Architect, Civil Engineer

www.gdp.arq.br Architecture, Project management

  • Management and coordination

Roman Schirmer, Architect

  • Clarification of the technical, legal, economic and environmental framework. Concept proposal and feasibility check.

04.2015 - 08.2015
Urban renewal project 'Porto Maravilha' : 'Pedro Alves' Sector  Feasibility studies for 73 housing and office buildings
Typology : Urban Renewal
Status : Study
City : Rio de Janeiro - RJ, Brazil
Area : 500m² - 7000m², Construction
Area : 79 450 m² / 73 Operations
Budget : 185'900'000 R$
Client : Consórcio Porto Novo, Private entity
Client : GDP - Gerenciamento e Desenvolvimento de Projetos, Private entity
Mission :
  • Ph. 2 PRELIMINARY STUDIES
Project pilot :

GDP - Gerenciamento e Desenvolvimento de Projetos

Responsible: Sergio Leusin, Architect, Civil Engineer

www.gdp.arq.br Architecture, Project management

  • Management and coordination

Roman Schirmer, Architect

  • Clarification of the technical, legal, economic and environmental framework. Concept proposal and feasibility check.

03.2014 - 03.2015
Project for the creation of an exhibition space in Rio de Janeiro downtown 
Typology : Public : Exposition spaces
Status : Study
City : Rio de Janeiro, RJ, Brazil
Area : 2000 m², Construction
Client : GDP - Gerenciamento e Desenvolvimento de Projetos, Private entity
Mission :
  • Ph. 21 Definition of the project, feasibility study
Project pilot :

Roman Schirmer, Architect

Architecture

  • Analysis and definition: needs, problems, requirements, risks. Report describing requirements and methodological approach.
  • Clarification of the technical, legal, economic and environmental framework. Concept proposal and feasibility check.

01.2014 - 02.2014
Restructuring of the last storie of an apartment building in Paris 
Typology : Housing : Flats
Status : Completed
City : Paris, France
Area : 75m² , Restoration
Budget : 127.930 € HT
Client : , Private entity
Mission :
  • Ph. 2 PRELIMINARY STUDIES
  • Ph. 3 PROJECT PLANNING
  • Ph. 4 TENDER
  • Ph. 5 REALISATION
Project pilot :

Jean-Baptiste Fourmont Architecte

Architecture

  • Management and coordination
  • Setting up the project duty booklet
  • Management
  • Cost management
  • Establishment and management of the general timetable. Monitoring of deadlines.
  • Project design
  • Technical development
  • Graphical representation
  • Site works supervision

Partners :

Roman Schirmer Architecte

Architecture

  • Project design
  • Technical development
  • Graphical representation

02.2010 - 07.2013
Low energy apartment building of 26 flats  Ecological clustered habitat
Typology : Housing : Apartment buildings
Status : Study
City : Sceaux, IDF, France
Area : 1831 m², Construction, IPMS2 (interiors)
Budget : 2'968'500 €, Excl. VAT, Construction
Client : Association Scéenne pour l'Habitat Participatif, Joint building venture
Mission :
  • Restricted competitions
Project pilot :

Atelier Kaba

Responsible: Hiroshi Naruse, Architect, Landscape Designer

www.atelierkaba.fr Architecture

  • Management and coordination
  • Sketch/conceptual design for the landscape architecture

Partners :

Roman Schirmer Architecte

Architecture

  • Analysis and definition: needs, problems, requirements, risks. Report describing requirements and methodological approach.
  • Preparation of the project specifications.
  • Estimation of administrative, study and construction costs.
  • Clarification of the technical, legal, economic and environmental framework. Concept proposal and feasibility check.
  • Sketch/conceptual design: analysis of intentions, needs and programme in the development of an architectural concept translated into a sketch.

Edouardo Rodriguez Architecte

Architecture

06.2013 - 07.2013
Extension and transformation of a House around a Patio 
Typology : Housing : Extensions
Status : Completed
City : Paris, France
Area : 85m², Construction
Budget : 183'000 €, Excl. VAT
Client : , Private person
Mission :
  • Ph. 2 PRELIMINARY STUDIES
  • Ph. 3 PROJECT PLANNING
  • Ph. 4 TENDER
  • Ph. 5 REALISATION
Project pilot :

Jean-Baptiste Fourmont Architecte

Architecture

  • Clarification of the technical, legal, economic and environmental framework. Concept proposal and feasibility check.
  • Sketch/conceptual design: analysis of intentions, needs and programme in the development of an architectural concept translated into a sketch.
  • Construction project: Elaboration of the construction project in view of the building application. Definition of construction principles and materials.
  • Description, presentation and coordination of the execution project
  • Technical development and elaboration of implementation details
  • Implementation plans
  • Cost control and expenditure monitoring
  • Construction scheduling
  • Site works supervision

Partners :

Roman Schirmer Architecte

Architecture

  • Clarification of the technical, legal, economic and environmental framework. Concept proposal and feasibility check.
  • Sketch/conceptual design: analysis of intentions, needs and programme in the development of an architectural concept translated into a sketch.
  • Construction project: Elaboration of the construction project in view of the building application. Definition of construction principles and materials.
  • Description, presentation and coordination of the execution project
  • Technical development and elaboration of implementation details

03.2011 - 07.2013
Roofs of Providence  Augmentation of a flat in Paris
Typology : Housing : Extensions
Status : Study
City : Paris, France
Area : 34.1 m², Restructuration, IPMS 3C (interiors)
Area : 11.2 m², Terasse
Budget : 110'000 €, Excl. VAT, Restructuration
Client : , Private person
Mission :
  • Ph. 2 PRELIMINARY STUDIES
  • Ph. 3 PROJECT PLANNING
Project pilot :

Roman Schirmer Architecte

10.2010 - 07.2013
Abondant T4 - Restructuration of a rural storing building in an two apartments house 
Typology : Housing : Apartment buildings
Status : Completed
City : Dreux, Eure et Loire, France
Area : 127 m², IPMS1 (interiors)
Budget : 117'200 €, Excl. VAT, Rehabilitation
Client : , Private person
Mission :
  • Ph. 1 STRATEGIC PLANNING
  • Ph. 2 PRELIMINARY STUDIES
  • Ph. 3 PROJECT PLANNING
  • Ph. 4 TENDER
  • Ph. 5 REALISATION
Project pilot :

Roman Schirmer Architecte

  • Management and coordination
  • Setting up the project duty booklet
  • Coordination of studies
  • Cost management
  • Establishment and management of the general timetable. Monitoring of deadlines.
  • Project design
  • Technical development
  • Site works supervision

Partners :

Jean-Baptiste Fourmont Architecte

  • Management and coordination
  • Setting up the project duty booklet
  • Cost management
  • Project design
  • Technical development
  • Graphical representation
  • Site works supervision

04.2011 - 06.2012
Loft conversion and creation of a roof deck   Small intervention in the historic district 'Butte aux Cailles' in Paris.
Typology : Housing : Terrace
Status : Completed
City : Paris, France
Area : 40m², Restructuration, IPMS1 (interiors)
Budget : 40.000€, Excl. VAT, Restructuration
Client : , Private person
Mission :
  • Ph. 1 STRATEGIC PLANNING
  • Ph. 2 PRELIMINARY STUDIES
  • Ph. 3 PROJECT PLANNING
  • Ph. 4 TENDER
  • Ph. 5 REALISATION
Project pilot :

Roman Schirmer Architecte

Architecture

02.2009 - 11.2011
Abondant 1 - Transformation of a farmhouse in a two-family house 
Typology : Housing : Houses
Status : Completed
City : Dreux, Eure et Loire, France
Area : 118 m², Restructuration, IPMS1 (interiors)
Budget : 53'100 €, Excl. VAT
Client : , Private person
Mission :
  • Ph. 1 STRATEGIC PLANNING
  • Ph. 2 PRELIMINARY STUDIES
  • Ph. 3 PROJECT PLANNING
  • Ph. 4 TENDER
  • Ph. 5 REALISATION
Project pilot :

Roman Schirmer Architecte

  • Management and coordination
  • Setting up the project duty booklet
  • Coordination of studies
  • Management
  • Establishment and management of the general timetable. Monitoring of deadlines.
  • Project design
  • Technical development
  • Graphical representation
  • Site works supervision

Partners :

Jean-Baptiste Fourmont Architecte

  • Management and coordination
  • Setting up the project duty booklet
  • Coordination of studies
  • Cost management
  • Project design
  • Technical development
  • Graphical representation
  • Site works supervision

03.2011 - 07.2011
Bioclimatic house-extension  Bioclimatic extension, integrated in the topography of its site.
Typology : Housing : Houses
Status : Study
City : Néoules, Var, France
Area : 110, Construction, IPMS1 (interiors)
Area : 129, Restructuration, IPMS1 (interiors)
Budget : 289.000 €, Excl. VAT
Client : , Private person
Mission :
  • Ph. 2 PRELIMINARY STUDIES
  • Ph. 3 PROJECT PLANNING
Project pilot :

Jean-Baptiste Fourmont Architecte

  • Estimation of administrative, study and construction costs.
  • Calculation of volumes and areas. Cost estimate of the preliminary project +/- 15%.
  • Sketch/conceptual design: analysis of intentions, needs and programme in the development of an architectural concept translated into a sketch.
  • Pre-project: refinement of the sketch with the help of experts. Drawing up a construction and material concept.
  • Estimate of costs +/- 10%.
  • Construction project: Elaboration of the construction project in view of the building application. Definition of construction principles and materials.

Partners :

Roman Schirmer Architecte

  • Preparation of the project specifications.
  • Compilation of basic data and decision protocol.
  • Clarification of the technical, legal, economic and environmental framework. Concept proposal and feasibility check.
  • Preliminary clarifications with official bodies. Protocol of decisions.
  • Sketch/conceptual design: analysis of intentions, needs and programme in the development of an architectural concept translated into a sketch.
  • Pre-project: refinement of the sketch with the help of experts. Drawing up a construction and material concept.
  • Construction project: Elaboration of the construction project in view of the building application. Definition of construction principles and materials.

04.2011 - 07.2011
Lofts Arago  Conversion of a commercial building into 4 loft flats
Typology : Housing : Apartment buildings
Status : Completed
City : Pantin, France
Budget : 201.700 €, Excl. VAT, Rehabilitation
Client : , Private entity
Mission :
  • Ph. 1 STRATEGIC PLANNING
  • Ph. 2 PRELIMINARY STUDIES
  • Ph. 3 PROJECT PLANNING
Project pilot :

Jean-Baptiste Fourmont Architecte

Architecture

Partners :

Roman Schirmer Architecte

Architecture

10.2010 - 07.2011
Loft in Pantin near Paris  Transformation of a hangar into a rental flat and a Loft
Typology : Housing : Transformation
Status : Completed
City : Pantin, IDF, France
Area : 160 m², Restructuration, IPMS1 (interiors)
Budget : 113'000 €, Excl. VAT
Client : , Private person
Mission :
  • Ph. 2 PRELIMINARY STUDIES
  • Ph. 3 PROJECT PLANNING
Project pilot :

Jean-Baptiste Fourmont Architecte

  • Management and coordination
  • Project design
  • Technical development
  • Graphical representation

Partners :

Roman Schirmer Architecte

  • Technical development
  • Graphical representation
  • Survey of the existing

02.2011 - 04.2011
Maisons groupés Karman  Feasibility study for individual grouped housing
Typology : Housing : Apartment buildings
Status : Study
City : Aubervilliers, France
Area : 585 m²
Budget : 366.000 €
Client : , Private entity
Project pilot :

Jean-Baptiste Fourmont Architecte

  • Setting up the project duty booklet
  • Project design

Partners :

Roman Schirmer Architecte

  • Project design

02.2011 - 03.2011
Au pied de Montmartre  Renovation of a Parisian roof-flat
Typology : Housing : Flats
Status : Completed
City : Paris, France
Area : 33 m², IPMS 3C (interiors)
Budget : 18.000 €, Excl. VAT, Renovation
Client : , Private person
Mission :
  • Ph. 3 PROJECT PLANNING
  • Ph. 4 TENDER
  • Ph. 5 REALISATION
Project pilot :

Roman Schirmer Architecte

  • Establishment and management of the general timetable. Monitoring of deadlines.
  • Project design
  • Technical development
  • Graphical representation
  • Site works supervision

09.2010 - 11.2010
Traditional Japanese house 
Typology : Housing : Houses
Status : Study
Area : 380 m², IPMS1 (interiors)
Budget : 1.200.000 €, Excl. VAT, Construction
Client : , Private entity
Mission :
  • Ph. 2 PRELIMINARY STUDIES
  • Ph. 3 PROJECT PLANNING
Project pilot :

Atelier Kaba

Responsible: Hiroshi Naruse, Architect, Landscape Designer

www.atelierkaba.fr Architecture

  • Management and coordination
  • Project design

Partners :

Roman Schirmer Architecte

  • Technical development
  • Graphical representation

01.2010 - 03.2010
Bouchardon Flat Restructuring  Transformation of a Parisian Flat in a '1900' Building.
Typology : Housing : Flats
Status : Completed
City : Paris, France
Area : 130 m², IPMS 3C (interiors)
Budget : 93.000 €, Excl. VAT, Restructuration
Client : , Private person
Mission :
  • Ph. 2 PRELIMINARY STUDIES
  • Ph. 3 PROJECT PLANNING
  • Ph. 4 TENDER
  • Ph. 5 REALISATION
Project pilot :

Roman Schirmer Architecte

  • Setting up the project duty booklet
  • Cost management
  • Establishment and management of the general timetable. Monitoring of deadlines.
  • Project design
  • Technical development
  • Graphical representation
  • Site works supervision

Partners :

Jean-Baptiste Fourmont Architecte

  • Project design
  • Graphical representation
  • Site works supervision

05.2009 - 01.2010
Brasserie Télécommande 
Typology : Commercial : Restaurants
Status : Study
City : Paris, France
Area : 508 m²
Client : , Private entity
02.2009 - 03.2009
Cristino-Garcia School  Kindergarden and primary school
Typology : Public : Schools
Status : Study
City : Aubervilliers, France
Area : 6 303 m², IPMS1 (interiors)
Budget : 11'000'000 €, Excl. VAT, Construction
Client : Communes de St-Denis et d’Aubervilliers, Public
Mission :
  • Restricted competitions
Project pilot :

Atelier Kaba

Responsible: Hiroshi Naruse, Architect, Landscape Designer

www.atelierkaba.fr

  • Management and coordination
  • Project design

Partners :

Roman Schirmer Architecte

  • Project design
  • Technical drawing

09.2008 - 10.2008
Centre Culturel et des Congrès de Montrouge  Rehabilitation
Typology : Public : Exposition spaces
Status : Completed
City : Montrouge, France
Area : 9 975 m2
Budget : 21,8 M €
Client : Commune de Montrouge
Project pilot :

Blond & Roux

www.blondroux.com Architecture

Partners :

Roman Schirmer Architecte

  • Technical development
  • Graphical representation

04.2008 - 06.2008
Construction de deux immeubles de logement  
Typology : Housing : Apartment buildings
Status : Completed
City : Paris, France
Area : 6065 m²
Budget : 8,48 M€
Mission :
  • Construction approval
01.2008 - 03.2008
Ferme du Rancure 
Typology : Housing : Houses
Status : Ongoing
City : Alpes-de-Haute-Provence, France
Area : 250 m²
Budget : Autoconstruction
Client : , Private person
Mission :
  • Ph. 2 PRELIMINARY STUDIES
  • Ph. 3 PROJECT PLANNING
Project pilot :

Roman Schirmer Architecte

Architecture

11.2006 - 05.2007
Court of Justice Yvelines  Versailles
Typology : Public : Other buildings
Status : Study
City : Versailles, France
Area : 11'000 m²
Budget : 40'500'000 €, Excl. VAT
Client : Ministère de la Justice, Public
Mission :
  • Restricted competitions
Project pilot :

Vincent Brossy & Associés

Responsible: Michaël Fellmann, Architect

www.brossy.com

  • Management and coordination

Roman Schirmer

  • Technical development
  • Graphical representation
  • Physical model

01.2007 - 03.2007
Casbah House 
Typology : Housing : Extensions
Status : Completed
City : Tanger (Maroc)
Client : , Private entity
Project pilot :

Roman Schirmer, Architect

09.2006 - 11.2006
Maison Marcais 
Typology : Housing : Houses
Status : Study
City : Entrevennes, Alpes-de-Haute-Provence, France
Area : 316 m², IPMS1 (interiors)
Budget : 470'000 €, Excl. VAT
Client : , Private person
Mission :
  • Ph. 2 PRELIMINARY STUDIES
  • Ph. 3 PROJECT PLANNING
Project pilot :

Roman Schirmer Architecte

  • Analysis and definition: needs, problems, requirements, risks. Report describing requirements and methodological approach.
  • Clarification of the technical, legal, economic and environmental framework. Concept proposal and feasibility check.
  • Sketch/conceptual design: analysis of intentions, needs and programme in the development of an architectural concept translated into a sketch.

08.2005 - 09.2005
School-building 'de la Gare' 
Typology : Public : Schools
Status : Completed
City : Paris , France
Area : 2700 m²
Budget : 3.8 M
Project pilot :

Vincent Brossy & Associés

Responsible: Régis Salomé, Architect

www.brossy.com

02.2005 - 04.2005
Pavillon de l'eau  Conversion of the historical Auteil pumping stations into a public water information centre
Typology : Public : Exposition spaces
Status : Completed
City : Paris, France
Area : 1200 m², IPMS2 (interiors)
Budget : 3'500'000 €, Excl. VAT, Rehabilitation
Client : Ville de Paris, Public
Mission :
  • Ph. 2 PRELIMINARY STUDIES
  • Ph. 3 PROJECT PLANNING
  • Ph. 4 TENDER
Project pilot :

Vincent Brossy & Associés

Responsible: Ivan Icart, Architect

www.brossy.com Architecture

  • Management and coordination

Roman Schirmer

  • Technical development
  • Graphical representation
  • Survey of the existing

11.2004 - 12.2004
Bastide Saint-Michel 
Typology : Housing : Houses
Status : Study
City : Alpes-de-Haute-Provence, France
Client : , Private person
Mission :
  • Ph. 1 STRATEGIC PLANNING
  • Ph. 2 PRELIMINARY STUDIES
  • Ph. 3 PROJECT PLANNING
Project pilot :

Roman Schirmer Architecte

  • Physical model
  • Survey of the existing
  • Analysis and definition: needs, problems, requirements, risks. Report describing requirements and methodological approach.
  • Clarification of the technical, legal, economic and environmental framework. Concept proposal and feasibility check.
  • Sketch/conceptual design: analysis of intentions, needs and programme in the development of an architectural concept translated into a sketch.

06.2004 - 08.2004
Bellevue House  Bioclimatic project in tropical ambient
Typology : Housing : Houses
Status : Study
City : Martinique, France
Area : 118 m², IPMS1 (interiors)
Area : 46 m² Terrasse
Budget : 266'000 €, Excl. VAT, Construction
Client : , Private person
Mission :
  • Ph. 1 STRATEGIC PLANNING
  • Ph. 2 PRELIMINARY STUDIES
  • Ph. 3 PROJECT PLANNING
Project pilot :

Roman Schirmer Architecte

  • Analysis and definition: needs, problems, requirements, risks. Report describing requirements and methodological approach.
  • Clarification of the technical, legal, economic and environmental framework. Concept proposal and feasibility check.
  • Sketch/conceptual design: analysis of intentions, needs and programme in the development of an architectural concept translated into a sketch.
  • Pre-project: refinement of the sketch with the help of experts. Drawing up a construction and material concept.
  • Construction project: Elaboration of the construction project in view of the building application. Definition of construction principles and materials.

01.2004 - 04.2004
Furniture 
Table Tâton 
Typology : Tables
Status : Ongoing
Format : Solitary Objects
City : Rio de Janeiro, Brazil
Project pilot :

SEA - Engineering Architecture

Responsible: Roman Schirmer, Architect, Civil Engineer

sea.archi

02.2015 - Ongoing
Tataïa luminaire  Table and bed lamp
Typology : Luminaires
Status : Completed
Format : Solitary Objects
City : Lausanne, Switzerland
Partners :

SEA - Engineering Architecture

Responsible: Roman Schirmer, Architect, Civil Engineer

sea.archi

02.2015 - 06.2024
Shelf Rio 
Typology : Shelves
Status : Completed
Format : Solitary Objects
City : , Switzerland
Project pilot :

SEA - Engineering Architecture

Responsible: Roman Schirmer, Architect, Civil Engineer

sea.archi

04.2016 - 07.2021
Modular Shelves  Modular system for the creation of shelve- and officesets
Typology : Shelves
Status : Ongoing
City : , France
Project pilot :

Roman Schirmer Architecte

06.2012 - 10.2013
Cairos Offices  Modular system for the creation of an efficient working environnement
Typology : Desks
Status : Completed
Format : Sets
City : , France
Project pilot :

Roman Schirmer Architecte

01.2009 - 03.2009
Protoypes and Models 
Room of Oak 
Typology : Furniture
Status : Completed
City : Paris, France
Partners :

Roman Schirmer Architecte

03.2010 - 04.2010
Building joinery : Conception, construction and installation of doors and windows  Saint-Michel
Typology : Joinery__windows
Status : Completed
City : Alpes-de-Haute-Provence, France
Project pilot :

Roman Schirmer, Architect

10.2006 - 10.2006
Model of the Bridge of Chateau Gontier  Exhibition model
Typology : Models
Status : Completed
City : Château-Gontier, France
Client : Architecture Environnement Infrastructures (AEI), Private entity
Project pilot :

Roman Schirmer Architecte

04.2006 - 06.2006
Modle of the 'Maison des Métalos'  Working model for the execution planning
Typology : Models
Status : Completed
City : Paris, France
Project pilot :

Vincent Brossy & Associés

Responsible: Roman Schirmer, Architect

www.brossy.com

11.2004 - 12.2004
Model of the 'Hôpital Rothschild Paris'  Working and presentation model for a competition
Typology : Models
Status : Completed
City : Paris, France
Project pilot :

Vincent Brossy & Associés

Responsible: Roman Schirmer

www.brossy.com

09.2004 - 10.2004
Model of the 'Hôpital Richaud - Versailles'  Working and presentation model for a competition
Typology : Models
Status : Completed
City : Versailles, France
Project pilot :

Vincent Brossy & Associés

Responsible: Roman Schirmer

www.brossy.com

04.2004 - 04.2004
Structural model of the 'Théâtre des Champs-Elysées'  Exhibitionmodel exposed in the 'Cité de l'Architecture et du Patrimoine' - Palais de Chaillot - Paris
Typology : Models
Status : Completed
City : Paris, France
Project pilot :

Alain Duperron Maquettiste

Partners :

Cécile Brun, Vincent Parot, Denis, Roman Schirmer

06.2002 - 09.2002
Engagement :  Other experiences      Authorship      Partnership      Subcontracting      Collaboration