Typology : Housing : Houses
Year : 2004
Status : Study

Project data

Situation : Martinique France
Area : 118 m² IPMS1 (interiors)
Area : 46 m² Terrasse
Budget : 266'000 € Excl. VAT Construction

Mission

Client : Private person
Period : 01.2004 04.2004
Mission :
  • Ph. 1 STRATEGIC PLANNING
  • Ph. 2 PRELIMINARY STUDIES
  • Ph. 3 PROJECT PLANNING
Engagement : Authorship

Contributors

Project pilot

 

Roman Schirmer Architecte

  • Analysis and definition: needs, problems, requirements, risks. Report describing requirements and methodological approach.
  • Clarification of the technical, legal, economic and environmental framework. Concept proposal and feasibility check.
  • Sketch/conceptual design: analysis of intentions, needs and programme in the development of an architectural concept translated into a sketch.
  • Pre-project: refinement of the sketch with the help of experts. Drawing up a construction and material concept.
  • Construction project: Elaboration of the construction project in view of the building application. Definition of construction principles and materials.